Skip to content

Commissioned by the Port of Rotterdam Authority, Hakkers will build another jetty. This jetty is being built for Wilmar for the transshipment of vegetable oils and biofuel-related products. Hakkers is constructing the hull jetty while the existing terminal continues to operate. The jetty will be completed in 2023.

The Wilmar jetty is the fifth successfully completed jetty in a row for Hakkers. We have completed dozens of petrochemical jetties before, so we put our knowledge and experience to good use to win the tender for Wilmar. We received the highest score in the quality domain and a maximum score for quality and project control. This clearly demonstrates the Port Authority’s confidence in us. The jetty was built using a proven concept with which we are very familiar. It has a foundation of open tubular steel piles topped with a concrete deck made of precast slabs. For protection, we equipped it with a prefabricated steel fender and mooring poles. We can complete the design, prefabrication and production in a systematic and controlled manner by manufacturing the steel and concrete parts in our own workshops. Our experienced staff also allows us a great deal of flexibility with phasing and moving around the work according to the needs of the end customer. This ensures that Wilmar’s existing operations can continue smoothly at both the terminal and the port.

NOTHING FEELS BETTER THAN TAKING ON A CHALLENGE

Want to meet the challenge with Hakkers and make your project a success? We deliver creative results with lasting added value.

Challenge us!

The first step towards a fitting solution.