Skip to content

If anchors cannot be installed using a standard anchor drill, we have a drill on a hydraulic excavator. You can then install anchors ‘over the top’ with the machine set up on the high side of the sheet piling. This drill is based on a 48-ton basic machine that is equipped with a leader holding the hydraulic drill motor.

Besides the drill, the equipment includes a grout mixing and pumping unit, a cement silo, an auxiliary crane for inserting the drill pipes, a power generator and various tools that ensure the entire machine is completely self-supporting.

NOTHING FEELS BETTER THAN TAKING ON A CHALLENGE

Want to meet the challenge with Hakkers and make your project a success? We deliver creative results with lasting added value.

Challenge us!

The first step towards a fitting solution.